Land Size 243 acre/ 98.4 Hectare
Irradiation 1,667.7 kWh/m2-yr Capacity 78 MWdc / 50 Mwac Annual Export Energy Not less than 95,134 MWh Performance Ratio 80% Interconnection Point PMU Bukit Changgang, 132kV underground cable Interconnection Distance 11.7 km Carbon emission displacement 68,700 tCO2 per year (throughout 21 years), total ~ 1.4 million tCO2 |
Land Size 123.4 acre
Irradiation 1793 kWh/m2-yr / 64, 891 MWh Capacity 45 MWdc / 30 Mwac Annual Export Energy 61240 MWh Performance Ratio 80% Interconnection Point PMU Bukit Selambau Interconnection Distance 1.7 km Carbon emission displacement 35,825 tCO2 per year (throughout 21 years), total ~ 0.752 million tCO2 |
Principle
Storing electrical energy to Secondary batteries (Li-ion, Lead-acid, NaS, etc) Composition Role - PMS: Control PCS, BMS - PCS: Convert AC/DC, Power quality control - BMS: Control and Monitoring batteries - Battery: Store electrical energy Life Expectancy: 10~20 years Efficiency: More than 85% Benefits - Reserving Power electricity - Frequency Regulation - Improving Power quality - Supporting Renewables - Supporting Users for efficient power usage - Voltage control - T&D investment Deferral Construction Period: Less than 1 year |