​TNB Sepang Solar Sdn. Bhd

Picture
​Land Size 243 acre/ 98.4 Hectare

Irradiation 1,667.7 kWh/m2-yr

Capacity 78 MWdc / 50 Mwac

Annual Export Energy Not less than 95,134 MWh

Performance Ratio 80%

Interconnection Point PMU Bukit Changgang, 132kV underground  cable

Interconnection Distance 11.7 km

Carbon emission  displacement
68,700 tCO2 per year (throughout 21  years), total ~ 1.4 million tCO2

​TNB Bukit Selambau Solar Sdn. Bhd. 

Picture
Land Size 123.4 acre
​
Irradiation 1793 kWh/m2-yr / 64, 891 MWh

Capacity 45 MWdc / 30 Mwac

Annual Export Energy 61240 MWh

Performance Ratio 80%

Interconnection Point PMU Bukit Selambau

Interconnection Distance 1.7 km

Carbon emission  displacement
35,825 tCO2 per year (throughout 21  years), total ~ 0.752 million tCO2

Biogas Flemington

Picture
​Capacity 800kW x 2 unit/each plant
​
POME required 500 m3 /daily

POME/FFB ratio 0.6 m3 /ton FFB

Annual Export Energy 8.4GWh/plant

Interconnection Point
Biogas Flemington-SSU Flemington POM

Carbon emission  displacement 4,914 tCO2/plant

Biogas Hadapan

Picture
​Capacity 800kW x 2 unit/each plant
​
POME required 500 m3 /daily

POME/FFB ratio 0.6 m3 /ton FFB

Annual Export Energy 8.4GWh/plant

Interconnection Point
Biogas Hadapan- SSU Hadapan POM

Carbon emission  displacement 4,914 tCO2/plant

Biogas Kempas (Under Construction)

Picture
Capacity 1.5MW

POME required 500 m3 /daily

POME/FFB ratio 0.55 m3/MT

Annual Export Energy 9.617 MWh (FM)

Interconnection Point TNB PE KKS KEMPAS

Interconnection Distance 500m (PSS)

Carbon emission  displacement 4,914 tCO2/plant

Scheduled Commercial Operation Date September 2022

TNB Bukit Selambau Solar Dua Sdn. Bhd. (Under Construction) 

Picture
​Land Size 180 acre

Irradiation 1,829.5 kWh/m2-yr

Capacity 75 MWdc / 50 MWac

Annual Export Energy 61240 MWh

Performance Ratio 80.7%

Interconnection Point PMU Bukit Selambau

Interconnection Distance 1.7 km

Carbon emission  displacement
59,446 tCO2 per year (throughout 21  years), total ~ 1.2 million tCO2

Battery Energy Storage System (BESS)

Picture
Picture
Picture
Principle
Storing electrical energy to Secondary batteries (Li-ion, Lead-acid, NaS, etc)

Composition Role
 - PMS: Control PCS, BMS
 - PCS: Convert AC/DC, Power quality control
 - BMS: Control and Monitoring batteries
 - Battery: Store electrical energy

Life Expectancy
: 10~20 years

Efficiency: More than 85%

Benefits
 - Reserving Power electricity
 - Frequency Regulation
 - Improving Power quality
 - Supporting Renewables
 - Supporting Users for efficient power usage
 - Voltage control
 - T&D investment Deferral

Construction Period: Less than 1 year
Powered by Create your own unique website with customizable templates.
  • Home
  • About TRe
    • The TEAM
    • Our Success Stories
  • Our Key Projects
  • Business with TRe
  • Highlights
    • Media Release
    • Videos
    • Reports
  • News & Bulletin
  • Contact Us